Harris Academy - Willmott Dixon - Passivhaus
Harris Academy, Chiltern Road, Sutton SM2 5QU
A £38 million, non-residential, ultra energy-efficient “Passivhaus” scheme comprising a sixth form-entry secondary-school for 1,275 pupils and 95 staff.
-
ARCHITECT: Architype Limited
-
CLIENT: London Borough of Sutton
-
MAIN CONTRACTOR: Willmott Dixon Construction Limited
-
DURATION: Two years
-
COMPLETION: July 2019
ASH Drywall undertook a works package including all drylining, metal-stud partitioning, integrated and suspended ceilings and plastering for the first “Passivhaus” standard secondary-school to be built in the UK.
SCOPE
Supply and fit: Ceilings (Integrated); Ceilings (Suspended); Partitions; Plastering.